Foton for port logistics — Tema/Mombasa/Durban operations

Foton for port logistics — Tema/Mombasa/Durban operations

Foton industrial / commercial applications

Foton International supplies a full commercial-vehicle range for industrial applications: AUMAN GTL-E heavy trucks, AUMAN EST medium trucks, AUMARK light trucks, and Tunland pickups. Engine partners: Foton Cummins, Yuchai, CATL (batteries). Transmission partners: ZF, Fast, Zhong Ma. Lead time 45-60 days from PO.

Full specifications — AUMAN GTL-E

Detailed specifications for the Foton AUMAN GTL-E:

Model AUMAN GTL-E
Variant LHD 6×4 Flat-roof Manual Tractor
Category Heavy Truck – Tractor
Steering LHD
Drivetrain 6×4
Transmission HW-12MT
Engine ISG12 / ISG 400 (Foton Cummins)
Fuel Diesel
Wheelbase (mm) 3300+1350
Dimensions L×W×H (mm) 6940x2490x3150
GVW (kg) 25000
GCW (kg) 90000
Ton Class 90T
Seats 2

Pricing and payment terms

Pricing: Request quotation (sales@fotonintl.com). Quotation includes FOB Qingdao (factory, ex-works), CIF to major African, Asian, and LATAM ports, or alternative trade terms per buyer preference.

Standard quotation validity: 30 days. Production lead time 45-60 days from PO confirmation.

Bulk / distributor pricing: Available for orders of 10+ units; specific tier pricing issued on direct inquiry.

Shipping and delivery

Production: 45-60 days from PO confirmation.

Shipping terms: FOB Qingdao / Shanghai / Tianjin — CIF available to major African & LATAM ports.

Sea transit: ~28–35 days from Qingdao to Global ports (major African, Asian, and LATAM ports).

Payment terms: T/T — 30% deposit on contract signing, 70% balance against B/L copy. L/C at sight also accepted (Irrevocable L/C at sight).

MOQ: 1 unit for sample orders; 10+ units for distributor pricing.

Frequently Asked Questions

What is the warranty on AUMAN GTL-E?

Foton International offers standard manufacturer warranty for Global buyers. Specific terms (months / kilometers) vary by model and component; consult your quotation. Warranty claims are processed through authorized channels.

How long does shipping take from China?

Standard production 45-60 days from PO + sea transit 28-35 days from Qingdao to major Global ports. CIF quotes include estimated arrival.

What payment terms does Foton accept?

T/T (deposit + balance against B/L copy) and Irrevocable L/C at sight. Other terms (D/P, OA) available for established buyers case-by-case.

Are spare parts available in Global?

Foton International maintains spare-parts supply through authorized channels. Lead time for common parts is typically 7-14 days via air, 30-45 days via sea. Specific channel availability depends on Global.

What documentation is required for import?

Bill of Lading, Commercial Invoice, Packing List, Certificate of Origin (China), and country-specific certifications (e.g., SONCAP for Nigeria, KBS for Kenya). Full document checklist issued with each contract.

Sources & data references

  • ~桌面/报价单/【重卡】GTL-E牵引车平顶左舵手动挡6X4_4.3.xlsx (factory quotation — internal reference)
  • ~桌面/福田拓路者皮卡产品宣传画册_V7-V9-E-G7-G9.pdf (Foton Tunland product brochure)
  • ~桌面/销售合同-中英文 福田收款账户(ELE4-7.5T).doc (standard export sales contract template)

Last updated: 2026-08-04 ·
Reviewed by: Foton International Export Team ·
Target market: Global

Related questions

  • [Related: All Foton vehicles for Global](https://fotonintl.com/country/global/)
  • [Related: Foton International contact & sales team](https://fotonintl.com/sales-agent/)
  • [Related: How to import Foton vehicles — full guide](https://fotonintl.com/qa/import-process/)
  • [Related: Foton spare parts ordering & lead time](https://fotonintl.com/qa/parts-ordering/)
  • [Related: Foton warranty terms — global policy](https://fotonintl.com/qa/warranty-global/)
Share this article :
Facebook
Twitter
LinkedIn
Pinterest